SURVEY AND DESIGN OF RAILWAY STATIONS AND FACILITIES

  • Determining the optimal location for a railway station, taking into account geographical, economic and transport factors.
  • Geodetic measurements: Surveyors take measurements of the area to create an accurate digital model, including terrain, existing infrastructure and communications.
  • Passenger flow analysis: The technologist evaluates the expected passenger flow, taking into account the geographical location, planned transport routes and demographic data.
  • Functional design: Identification
    of functional areas of the station, such as passenger halls, platforms, ticket areas, retail areas and others, taking into account the needs of passengers and operational tasks.
  • Architectural design: The development of architectural solutions, taking into account aesthetic, cultural and structural aspects, as well as compliance with building standards.
  • Engineering communications: Design of engineering systems, including power supply, water supply, sewerage, ventilation, etc., to ensure the efficient operation of the station.
  • Safety and ecology: Implementation of safety measures for passengers and staff, as well as consideration of environmental standards in design and construction.
  • Transport infrastructure: Development of infrastructure on platforms, parking areas, bus stops and other transport hubs to ensure the convenience of passengers.
  • Technology use: Integration of modern technologies into design, such as passenger information systems, contactless payment technologies, video surveillance, etc
  • Economic justification: Conducting an economic analysis of the project, including the costs of construction, maintenance and expected return from the station.
  • Coordination with regulatory authorities: Obtaining all necessary permits and approvals from the relevant authorities, compliance with regulations and standards.
  • Construction and implementation: After the approval of the project, the construction phase begins, followed by the implementation and commissioning of the station.

Fill out the questionnaire and FIND OUT THE COST OF DEVELOPING DESIGN ESTIMATES for construction

1
2
3
4
5
6

Fill out the questionnaire and FIND OUT THE COST OF DEVELOPING DESIGN ESTIMATES for major repairs

1
2
3
4
5
6